Phase 2 and 2B Complete October 2015

Complete in October 2015, Phase 2 connected 329 users and added 281 miles of pipeline to the system, as well as two booster stations. The city of Woodworth was also added to the system as part of this phase. Phase 2 was completed at a cost of $10.7 million, 70 percent of which was funded through a North Dakota State Water Commission cost-share grant, and the remainder through a USDA Rural Development loan. Phase 2B connected 128 users, added 164 miles of pipeline, and constructed a 365,000-gallon standpipe tank near Woodworth. Phase 2B was completed at a cost of $5.4 million. It was funded through a 70 percent cost-share grant from the State Water Commission and a USDA Rural Development loan.